1) Close up of Sump (flows right to left) Intake=> Foam=>Bio (lava rock/ceramic)=> Chemical (Purigen and whatever else I need at the time)
2) Stupid off set holes (back and bottom painted black)
3) Third different idea for plumbing... Shorted myself a 90* somehow, but there will be one on the end of the drain pipe in the right corner. Deciding on dimensions of overflow box to build around it...
2) Stupid off set holes (back and bottom painted black)
3) Third different idea for plumbing... Shorted myself a 90* somehow, but there will be one on the end of the drain pipe in the right corner. Deciding on dimensions of overflow box to build around it...