Cerges' Reactor - DIY Inline CO2 Reactor
Planted Tank Forums
Your Tanks Image Hosting *Tank Tracker * Plant Profiles Fish Profiles Planted Tank Guide Photo Gallery Articles

Go Back   The Planted Tank Forum > Specific Aspects of a Planted Tank > DIY


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-12-2010, 10:48 PM   #1
Craigthor
Planted Tank Guru
 
Craigthor's Avatar
 
PTrader: (188/100%)
Join Date: Sep 2007
Location: Dubuque, IA
Posts: 9,628
Default Cerges' Reactor - DIY Inline CO2 Reactor

Have to thank our Russian friends for this one. After playing with the Rex Griggs reactor I wanted to try something else. Principal and cost are about the same design is different.

http://translate.google.com/translat...n&hl=&ie=UTF-8

What you will need:

Omni OB1 Series A House Filter
2- 1/2" Male Threaded Adaptors with Barb end
2- 3/4" 90 degree Street fitting
2- 3/4" PVC Male Adaptor
2- 3/4" x 1/2" PVC Bushing
1- 3/4" CPVC Coupling - Note this has to be CPVC not PVC as the PVC fittings are too big
1- 6 3/4" x 3/4" CPVC Pipe - Again has to be CPVC and not PVC
PVC Primer and Cement
CO2 Tubing
Teflon Thread Tape
Scissors
Needle Nose Pliers
Filter Tubing
Drill and Drill bit for your CO2 Tubing

Total cost as ~ $23 each about the same as the Rex Griggs inline reactor if you don't use clear pvc.

Filter Housing:





Start by removing the Priming Button via the screw on the inside of the lid for the housing:




Drill out the hole to accept your CO2 tubing this hole shpould be smaller then your CO2 Tubing so it creates its' own seal.



Cut the CO2 tubing at a sharp angle so you can stick it through and pull it with the needle nose pliers. This should be slightly tough to pull through as it will create a seal as you pull the tubing through.





Cut the CPVC pipe off at 6 3/4", if you are using a different filter you may have to adjust the cut off length. I cut mine so it was about 3/4" off the bottom. Push the CPVC coupler over the nipple in the lid, should fit really snug. Then push the CPVC pipe into the coupler. I didn't glue this together as it was a snug fit and should be under little pressure.




Lay out and glue the fittings together, with the fitting I chose you won't need any extra 3/4" pipe as all the fittings go together.





Attach the fittings to each side jsut make sure you hook them up according to the Flow marking on the lid. Finished Product.



I will update tomorrow once I install these as to how effective they are, but based on looks they should function really well. According to the article I linked to about he got a .5 PH change in a matter of minutes.

Craig
__________________
Rebooting...

Quote:
Originally Posted by cdwill View Post
"C'mon, they're just plants, man, no big deal -- try some"
Craigthor is offline   Reply With Quote
 

Quick Reply
Message:
Options

Register Now

In order to be able to post messages on the The Planted Tank Forum forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.
User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.
Password:
Confirm Password:
Email Address
Please enter a valid email address for yourself.
Email Address:

Log-in

Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.



Thread Tools
Display Modes

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:44 AM.


Powered by vBulletin®
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright Planted Tank LLC 2012