The Planted Tank Forum - View Single Post - Rickztahone's 55g and 2 x 10g projects (update 02-13-11)
View Single Post
Old 10-14-2010, 04:27 AM   #4
rickztahone
Wannabe Guru
 
rickztahone's Avatar
 
PTrader: (15/100%)
Join Date: Jul 2009
Location: Pacoima, California
Posts: 1,346
Default

i forgot to mention my water change plumbing. I bought a temperature control valve since my discus like the warmer water. So the temp valve keeps the temp from going over 84F even when i have both valves fully open. here's a shot under the stand where the valves are for H and C.


on that same picture you can see where i made a hole for the pvc drain through my wall and out to the side of the house to the front lawn. here's where i placed the pvc end to drain the tank.


It has a cap to keep critters out.

here's a shot of how the temp valve looked at first, but i had to change it a bit due to the fact that it mixed both the H/C water through the temp valve. Now, it mixes them through the top side of the U which has both the H/C added to it and does not reduce the output pressure. It took some tweeking but i finally got it to where i liked it. Sry, i don't have any current pics of how it looks now so i had to settle for the old one.


i generally do not use the hose to fill up the 125 since the pvc leads directly to the U that hangs on the rim, but i added the hose so that i can fill up another tank if necessary. It use to take me quite a while to do a full water change, in my case from 80-100%. It takes me roughly 20 minutes to do a full WC now
rickztahone is offline   Reply With Quote