|
||||||||||||||
|
||||||||||||||
|
|||||||
| Advertisements | |
| Get Rid of Advertisements | |
|
|
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|
#1 (permalink) |
|
Algaephilus relucticans
|
Milwaukee sm101 question
my sm101 is here and i have a question regarding operation that wasn't addressed in the manual. i understand that it is not advisable to let the probe dry out. so i assume that it is common practise to leave the probe in the tank continuously. the monitor is then turned on when the user wishes to find out what the pH is, then the unit is turned back off again until the next use. is this correct? i know this sounds like a boneheaded question but i want to get this right. thanks a lot in advance.
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Ehiem and CO2 Question | jahysun | Equipment | 19 | 08-17-2004 12:53 AM |
| Removing Solenoid on Milwaukee All-In-One Regulator | FobbyBobby | Equipment | 4 | 07-12-2004 02:53 AM |
| Planted Tank Light Temp K Question | nexstar | Lighting | 10 | 05-27-2004 09:29 PM |
| milwaukee sms122 setpoint question (again) | gmaniac | Equipment | 3 | 03-13-2004 01:41 AM |