Not really a major update, but I'm kinda on track to move the tank in this weekend. I've finally finalized my return plumbing setup:
This setup allows me to put two pressure gauges, one before and one after the venturi, so I can dial in that 30% pressure (optimize setting?) differential.
And finally installed the door, I wish they were taller, but... oh well.
And the "missile silo" aka pentair heaters/uv setup.
Lastly, top to bottom, all cords from the light fixture are hidden now, need to do the same for the controller.
One thing I learn about PVC fittings, you'll always be missing that one part!
Enjoy,