Proggres pics:
Taken at around 11.00 to illustrate light availability. From this time to around 2.30 sunlight tend to be hitting quite directly to the pond area (lowest part).
The backdrop is done up to around 14+ feet with spacing until 18 feet. The rest up to the roof opening will not be heavily carved.
Close up on the detail.
The texture is not yet finished as work continue. It does change colour from dark to lighter due to the drying of material.