View Single Post
Old 11-22-2005, 09:26 AM   #1 (permalink)
Ibn
Moderator
 
Ibn's Avatar
 
PTrader: (7)
Join Date: Nov 2003
Location: San Jose, CA
Posts: 3,123
Default New Reactor Build

Taking this entire week off from work and have nothing better to do than to get started on the new reactor.

2 sections of 3" polycarbonate tubing. One section is 6" and the other is 8".



Diffuser from Aqua Forest



What's needed (this is actually half of it. There's another set of these for the other end).



What one end looks like with the parts attached. Hose clamp is left off, but it's not hard to figure where it goes.



What half of the reactor will look like. Hole isn't drilled yet for the airline nipple and I'm still looking out for a tee to hook both tubes up. The tee will be threaded (slipxthreadxslip) so that I can take the reactor apart to clean the diffuser and reactor itself down the line. It's also missing bioballs for the moment.
__________________
Eric

Ibn is offline   Reply With Quote