Today I learned the value of a good reflector - The Planted Tank Forum
Reply
 
LinkBack Thread Tools Display Modes
post #1 of 16 (permalink) Old 02-16-2003, 04:36 AM Thread Starter
Planted Tank VIP
 
GDominy's Avatar
 
Join Date: Jul 2002
Location: Victoria,British Columbia, Canada
Posts: 3,457
I painted the inside of the canopy with Tremclad high heat white paint tonight and, I gotta say, WOW. I tried the canopy with just 2 4 foot power glo's and was blown away. INFINITELY brighter, and a much whiter light.

The VHO's are still giving off a yellow hue, but not too bad now at all. I think I will replace one of the 3 bulbs with a higher K bulb, but I wont need to do them all.

Thank you all for the suggestions, you saved me a lot of money in experimentation.
GDominy is offline  
Sponsored Links
Advertisement
 
post #2 of 16 (permalink) Old 02-17-2003, 01:57 PM
Planted Tank VIP
 
GulfCoastAquarian's Avatar
 
Join Date: Jul 2002
Location: Winston-Salem, NC
Posts: 3,578
I'm also using White paint in one of my canopies and while the light is pretty brilliant, I am tempted to try an actual parabolic reflector. I wish I had a lux meter to actually quantify the difference, though!

- Sam P -
plantedtanker in limbo - all tanks currently in storage
GulfCoastAquarian is offline  
post #3 of 16 (permalink) Old 02-18-2003, 03:20 PM Thread Starter
Planted Tank VIP
 
GDominy's Avatar
 
Join Date: Jul 2002
Location: Victoria,British Columbia, Canada
Posts: 3,457
GDominy is offline  
 
post #4 of 16 (permalink) Old 03-18-2003, 04:33 AM
Wannabe Guru
 
jart's Avatar
 
Join Date: Jan 2003
Location: NS Canada
Posts: 1,395
gulf:

any ideas as to where you might find such a parabolic reflector? about the only thing i can find referenced is the coralife aqua mirror which is a flat design.

i suppose you could bend some polished sheet metal, but then you'd just be guessing at the angles, and might actually be better off with a flat surface.
jart is offline  
post #5 of 16 (permalink) Old 03-18-2003, 02:01 PM
Planted Tank VIP
 
GulfCoastAquarian's Avatar
 
Join Date: Jul 2002
Location: Winston-Salem, NC
Posts: 3,578
Jart, I'm actually working on my own reflector design. I started with the Miro-4 reflector that AHSupply uses and optimized it for two T12 tubes, spaced 2 1/2" apart. I'm working on optimizing the reflection angles to get the most output. I could publish a template at that point, and you could use aluminum flashing to bend your own reflector. It's going to take me a while to get it optimized, though, since work has been busy lately.

- Sam P -
plantedtanker in limbo - all tanks currently in storage
GulfCoastAquarian is offline  
post #6 of 16 (permalink) Old 03-18-2003, 07:31 PM
Planted Member
 
STAT 007's Avatar
 
Join Date: Feb 2003
Location: College Station, TX
Posts: 241
Send a message via AIM to STAT 007
Leave it to an ME to do something like this... LOL. Good work, GCA!

Sincerely,
STAT 007
Fightin' Texas Aggie Class of 2004

37 gallon AGA Black Seal, Emperor 400, Ebo Jager 200 W, 100% Flourite Substrate, 2x55 Watt AH Supply PC Lighting (5300K & 6400K) @ ~3.4 WPG, High-Pressure CO2.
STAT 007 is offline  
post #7 of 16 (permalink) Old 03-18-2003, 10:07 PM
Planted Member
 
Work In Progress's Avatar
 
Join Date: Mar 2003
Location: Peaches, Peanuts & Cotton
Posts: 288
Send a message via AIM to Work In Progress Send a message via MSN to Work In Progress
Oh Sam,
your giving me visions of my nightmarish math class in highschool...
Your diagram looks sharp, yet very complicated, LOL! Good work!

Kelly

~*~Kelly~*~
Work In Progress is offline  
post #8 of 16 (permalink) Old 03-19-2003, 02:26 AM
Wannabe Guru
 
jart's Avatar
 
Join Date: Jan 2003
Location: NS Canada
Posts: 1,395
gulf what computer program are you using?

looks like a prototype of r2d2's noggin. :P
jart is offline  
post #9 of 16 (permalink) Old 03-19-2003, 05:47 AM
Planted Member
 
STAT 007's Avatar
 
Join Date: Feb 2003
Location: College Station, TX
Posts: 241
Send a message via AIM to STAT 007
Quote:
Originally Posted by jart
gulf what computer program are you using?

looks like a prototype of r2d2's noggin. :P

LMAO!!!

Sincerely,
STAT 007
Fightin' Texas Aggie Class of 2004

37 gallon AGA Black Seal, Emperor 400, Ebo Jager 200 W, 100% Flourite Substrate, 2x55 Watt AH Supply PC Lighting (5300K & 6400K) @ ~3.4 WPG, High-Pressure CO2.
STAT 007 is offline  
post #10 of 16 (permalink) Old 03-19-2003, 10:46 AM
Planted Tank VIP
 
Join Date: Oct 2002
Location: Lebanon, CT
Posts: 4,939
:arrow: Sam For President

Buck is offline  
post #11 of 16 (permalink) Old 03-19-2003, 02:00 PM
Planted Tank VIP
 
GulfCoastAquarian's Avatar
 
Join Date: Jul 2002
Location: Winston-Salem, NC
Posts: 3,578
Haha, I just completely laughed out loud after reading this thread just now.

That design program I'm using is Unigraphics NX. I'm just manipulating input angles, radiating from the center of the bulbs. The lines are constrained such that index of reflection = index of refraction and I can follow the reflected light into the tank. There is a lot of re-strike with two bulbs in one reflector. I was thinking of scrapping this idea and making just single bulb reflectors. Reflectivity would increase drastically. I'll tell you this much, AHSupply's Miro-4 does NOT reflect 99.4% of emitted light into the tank!

- Sam P -
plantedtanker in limbo - all tanks currently in storage
GulfCoastAquarian is offline  
post #12 of 16 (permalink) Old 03-19-2003, 02:18 PM
Planted Member
 
STAT 007's Avatar
 
Join Date: Feb 2003
Location: College Station, TX
Posts: 241
Send a message via AIM to STAT 007
Quote:
Originally Posted by GulfCoastAquarian
I'll tell you this much, AHSupply's Miro-4 does NOT reflect 99.4% of emitted light into the tank!

UGH!!! What a rook! Kim, you're busted!

Just kidding. It kinda bothers me that this claim of theirs is false, but I've been SUPER happy with the products and service I've received from AH Supply so I'll let this one slide.

Sincerely,
STAT 007
Fightin' Texas Aggie Class of 2004

37 gallon AGA Black Seal, Emperor 400, Ebo Jager 200 W, 100% Flourite Substrate, 2x55 Watt AH Supply PC Lighting (5300K & 6400K) @ ~3.4 WPG, High-Pressure CO2.
STAT 007 is offline  
post #13 of 16 (permalink) Old 03-19-2003, 02:29 PM
Planted Tank VIP
 
GulfCoastAquarian's Avatar
 
Join Date: Jul 2002
Location: Winston-Salem, NC
Posts: 3,578
Quote:
Originally Posted by STAT 007
Quote:
Originally Posted by GulfCoastAquarian
I'll tell you this much, AHSupply's Miro-4 does NOT reflect 99.4% of emitted light into the tank!

UGH!!! What a rook! Kim, you're busted!

Just kidding. It kinda bothers me that this claim of theirs is false, but I've been SUPER happy with the products and service I've received from AH Supply so I'll let this one slide.
Well I amend my statement, I double checked and it is Miro-4 that has the 99% reflectivity claim, not ahsupply. Kim, you're all good! It is the material that is 99% reflective, which does play a huge role in the quality of a reflector. If the aluminum flashing you buy to make your own reflector does only reflect 86% as AHsupply indicated (seems plausible) then even with optimized reflection angles, you still might not be as efficient as if you used enhanced polished aluminum.

I'm not looking to beat AHSupply's performance, only match it for a lower price. Something I could make for $5 (for a 10" by 10 foot roll) and have a decent reflector on all of my tanks.

But I repeat - AHSupply's reflector is excellent. Their claim is not false, as far as I know.

- Sam P -
plantedtanker in limbo - all tanks currently in storage
GulfCoastAquarian is offline  
post #14 of 16 (permalink) Old 03-27-2003, 01:19 AM
Wannabe Guru
 
jart's Avatar
 
Join Date: Jan 2003
Location: NS Canada
Posts: 1,395
well, gulf et al, i have found a sheet metal shop that is willing to do some cutting and bending on a small scale.

to keep things simple, i think i'll just go with a couple of pieces of metal, and cover them with aluminum tape.

plan: metal - bulb - bulb - bulb - metal (i tried to illustrate this better using /'s and \'s and |'s and the like but it wouldn't turn out. hopefully this is making sense).

if any of you care to comment as to what angles (maybe just a simple 45 degree?) would be perferred i'd be very grateful. thanks for any opinions.
jart is offline  
post #15 of 16 (permalink) Old 03-27-2003, 02:44 AM
Wannabe Guru
 
Join Date: Oct 2002
Location: Houston, TX
Posts: 1,614
window tint!

where did I read that? Can't recall....

anona, pretty dim this evening
anonapersona is offline  
Reply

Quick Reply
Message:
Options

Register Now



In order to be able to post messages on the The Planted Tank Forum forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.

User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.

Password:


Confirm Password:
Email Address
Please enter a valid email address for yourself.

Email Address:
OR

Log-in









Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.



Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Display Modes
Linear Mode Linear Mode



Similar Threads
Thread Thread Starter Forum Replies Last Post
millennium 3000 filters any good? LaZy_JoKeR Equipment 1 09-25-2004 06:49 PM
Please advise: good T8 reflector? Andrew Lighting 2 07-14-2004 01:47 AM
Planted Tank Chat Transcripts! KyleT General Planted Tank Discussion 0 02-26-2004 09:20 PM
The importance of a good reflector: A photographic Study Gomer Equipment 15 10-02-2003 12:41 PM
Source for a good DIY reflector. mario Lighting 3 07-12-2003 09:59 PM

Posting Rules  
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

 
For the best viewing experience please update your browser to Google Chrome