Today I learned the value of a good reflector - Page 2 - The Planted Tank Forum
Reply
 
LinkBack Thread Tools Display Modes
post #16 of 16 (permalink) Old 04-02-2003, 01:17 AM
Wannabe Guru
 
jart's Avatar
 
Join Date: Jan 2003
Location: NS Canada
Posts: 1,394
so, i decided on getting some reflector material today. i went to a sheet metal place and got two thirty eight inch long pieces of aluminum (4 inches wide) bent at thirty degree angles (in 2 places) for a grand total of $4.60.

decided on the 2 x 30 degree angle configuration by going to the ahsupply website and crudely measuring the angles on one of their reflector diagrams. of course, i'll never really know if these reflectors are actually working, but i guess it's worth a try. plus, once i get the hood all assembled, i'd be less inclined to add any extra features. might as well do it now.
jart is offline  
Sponsored Links
Advertisement
 
Reply

Quick Reply
Message:
Options

Register Now



In order to be able to post messages on the The Planted Tank Forum forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.

User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.

Password:


Confirm Password:
Email Address
Please enter a valid email address for yourself.

Email Address:
OR

Log-in









Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.



Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Display Modes
Linear Mode Linear Mode



Similar Threads
Thread Thread Starter Forum Replies Last Post
millennium 3000 filters any good? LaZy_JoKeR Equipment 1 09-25-2004 06:49 PM
Please advise: good T8 reflector? Andrew Lighting 2 07-14-2004 01:47 AM
Planted Tank Chat Transcripts! KyleT General Planted Tank Discussion 0 02-26-2004 09:20 PM
The importance of a good reflector: A photographic Study Gomer Equipment 15 10-02-2003 12:41 PM
Source for a good DIY reflector. mario Lighting 3 07-12-2003 09:59 PM

Posting Rules  
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

 
For the best viewing experience please update your browser to Google Chrome